E1 Upgrade From Tools Release 8.95.P1 to 8.96.xx

Read Time:1 Min, 17 Sec

Ok, I have been caught a number of different times thinking that a process was going to be “easy” and had it turn into a knock-down, drag-out, 3-week battle to get E1 to do what I wanted it to do. So, when researching what it was going to take to upgrade from Tools Release (TR) 8.95.P1 to 8.96 I figured I would go the extra mile and submit a case to Oracle’s support.

Wow, was I shocked to learn that it was the same process that I have used in the past to upgrade one-offs (ex. 8.95.M1 to 8.95.P1)! Not bad. I’ve done this many times. However, there is one catch, I will have to install IBM Websphere 6.0 and scrap my IBM WAS 5.0. Hey, no problem. I was at Oracle’s Open World last fall and sat through a full day of training for that.

So, now I asked one of our WinTel server guys to create a fresh install of Windows Server 2003 on our VMWare server. Once that is done, I will install IBM WAS 6.0. Then upgrade the deployment server so that I can use both TRs and configure the Enterprise Server to have Pristine run 8.96.xx and start testing.

Oh, if you are not using “Multiple Foundations”, you are definitely making things harder than they have to be. I’ll post a comment about that soon.

Have Fun!

Technorati Tags: e1,enterpriseone,erp,peoplesoft,oracle,jde,jd edwards

Author

Stewart Schatz

Career: Principal CNC Consultant for Syntax Systems Limited specializing Oracle JD Edwards EnterpriseOne and the technology that supports it. Side Hustle: Owner/Operator of E1Tips.com Location: Lancaster, PA USA  What I like to do: Invest in Family, Explore Technology, Lead Teams, Share Knowledge/Experience, Hunt, Hike, etc.

Average Rating

5 Star
0%
4 Star
0%
3 Star
0%
2 Star
0%
1 Star
0%

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Previous post Deleting User Overrides In EnterpriseOne (E1)
E1Tips Qucik Tip Next post E1 Terminology